Over a third (37%) of weather-related rail delays from 1st April 23 – 31st March 2024, were caused by flooding.
The CP7 investment, aimed at helping the rail industry better cope with extreme weather, highlights the unfortunate reality that climate change is playing an ever-increasing role in the reliability of the rail network.
This month’s Rail Director magazine features Operations Manager Geraint Gibbs, who shares insights on how the industry can combat this growing challenge through innovative technology and strategic planning.
Read the full article here: https://issuu.com/raildirector/docs/rdoct24/20